Design And Supervision for The Pontoon Disposal / supply and installation of gangway at Al Jaddaf

Client:

BVA Ports & Marine Contracting

Location:

Al Jaddaf, Dubai, UAE

• Design of removal and disposal of 7 finger pontoons
• Design and supervision of relocation of 9 pedestals including SOS pedestals
• Structural and marine design of the new gangway and associated marine elements, including landing pontoon, cantilever platform with decking, and capping beam works.
• Authority Submissions & Approvals
• Construction Supervision
Design and supervision for the removal and disposal of existing finger pontoons, relocation of nine pedestals including SOS pedestals, and structural and marine design of the new gangway with associated elements — landing pontoon, cantilever platform with decking, and capping beam works. The scope also included authority submissions, approvals, and construction supervision.