Al Khaleej Street Tunnel Storm Water Drainage

Client:

Wade Adams Contracting L.L.C

Location:

Al Shindagha Corridor - Al Khaleej, Dubai

• Preparation & Submission of EIA Report
• Baseline Environmental Monitoring
•Hydrodynamic Modelling Study (2D) -MIKE 21 HD
• Sediment Plume Study (2D) -using DHI MIKE 21-MT
• Initial dilution -using CORMIX model
• Bathymetry & ADCP Data
• Conduct Bathymetric Survey and ADCP Installation
• EIA Approval & Obtaining EC
As part of Dubai’s vision for world-class infrastructure, B&O Engineering proudly contributed to the Al Shindagha Corridor Stormwater Drainage Project. Our team delivered advanced environmental and marine consultancy to ensure that the stormwater outfall system was designed, monitored, and approved in full compliance with regulatory standards.

From state-of-the-art hydrodynamic and sediment plume modelling to comprehensive marine surveys and environmental impact assessments, we combined engineering precision with environmental responsibility. The result is a sustainable drainage solution that protects the city’s infrastructure while safeguarding its marine ecosystem.

This project highlights our ability to support large-scale, complex developments by integrating technical excellence, regulatory approvals, and sustainable practices—reinforcing B&O Engineering’s role as a trusted partner in shaping Dubai’s future.